NYC Contractors: Concrete Flooring

2009 April 25
by Thurmus

During the past few BuildingsNY conferences held in the Javits center, a few booths always grabbed my attention. Whether it was the flash of the presentation, the product or the snacks and free stuff (come on, who isn’t immune!) I usually left with some grand ideas such as installing things like “green walls” or adding extra EV shielding film to existing windows.

This summer I might have the chance to at least do one cool thing I initially saw at each of the last three BuildingsNY conferences — concrete flooring. I had been meaning to properly finish a basement and make it into a truly livable area. However the existing concrete floor was poured with the thought that it was eventually going to be covered in carpet (former owner’s idea, not mine). As a result, the floor needs not only cosmetic improvements but also some additional functionality built in.

Dreaming of features before the first estimate comes in typically results in grandiose wish lists like the one that follows:

  • Overlay a levelled concrete floor over the existing concrete floor
  • Pitch the new floor towards an existing french drain (just in case)
  • Introduce concrete baseboard molding
  • Refinish concrete stairs leading down to the basement

and of course, the wallet buster:

  • Rremove existing baseboard heating (basement only) and
  • Determine feasability and installation of a radiant heading system

So far, I’ve sent the following email to:

  1. Acid Stain Flooring (http://acidstainflooring.com)
  2. Extremem Concrete Design (as seen at BuilingsNYC) (http://extremeconcretedesign.com)
  3. The Concrete Impressionist (http://concreteimpressionist.com)

[insert company specific intro here] 

If I’m in one of the areas that you work in, I would like to request a meeting regarding a basement improvement project I’m hoping to have completed this summer.
 
Core project summary:
 
Overlay a finished concrete floor over an existing concrete basement floor. The space consists of two main rooms and one hallway (no dividing walls):

  • Room 1 dimensions: 18′10″ (w) by 15′6″ (l)
  • Room 2 dimensions: 17′8″ (w) by 9′2″ (l)
  • Hallway dimensions (connecting the two rooms): 8′1″ (w) by 7′6″ (l)

Additional Factors/Possible Extras:

  • Baseboard heating near the floor
  • French drain installed near the front of the basement
  • Would like to determine feasability of concrete baseboard molding
  • Finished floor would be pitched slightly toward a french drain
  • Concrete stairs leading down to the basement from inside the house are uneven (depth between individual stairs and the length of each individual stair). I would like to know if this is something that could be corrected.
  • Extra: Implementing a radiant heating system with a finished concrete floor.

Please reply to this email with any questions or possible appointment dates, or I can be contacted at… [insert contact info]

Contact Updates (5/19/2009):

  • The Concrete Impressionist: Sent the email three times – the last two copies were sent after getting off the phone with them after being reassured I would receive a response, which so far, has not come.
  • Extreme Concrete Design: Sent the email above twice and called twice, no response on the email, no callbacks from the voicemail.
  • Acid Stain Flooring: Sent the email twice called once, no response.

Overall experience: I’m starting to look at using tile instead of using finished concrete. The companies listed above don’t seem ready to handle more work than they have right now and there don’t seem to be many more around to choose from.

One Response leave one →
  1. 2009 May 12

    Update (05/12/09):

    So far, not one of the above has responded to my email, so I’ve taken to calling each of the companies above and leaving voicemail.